Dairy facilities house one of the most highly regulated processes, requiring superbly sanitized working environment. The building design must be easy to clean in order to inhibit germ growth. The design must utilize cleanable materials with minimum flat surface areas. • 238,720 sf with 12,000 sf administrative office building and 11,500 sf Truck Maintenance Garage with fueling island • Six bay raw milk receiving 60 trucks daily processing 2 million gallons per week • 25,000 sf cooler storage with 69,600 cubic feet of Automatic Storage Retrieval System (ASRS) with 12 bays of distribution • Constructed of structural steel frame and metal bar joists; envelope and interior partitions of Insulated Metal Panels.